   


|
 |

San Francisco, California
Fujitec America was initially contracted to install 15 heavy duty
transit escalators in five stations of the San Francisco subway system.
Fujitec was also recently awarded the contract to manufacture and
install eight heavy duty transit escalators, five hydraulic elevators
and four traction elevators at the Millbrae Station for the same subway.
These units travel at 90 feet per minute with a maximum rise of 29
feet. |
|